Solution Overview
HDRE, with its expert in-house design and engineering teams, has accumulated over 400MW of project construction experience, including rooftop, ground-mounted, floating, and aquavoltaic systems. Our projects span diverse environments, such as detention basins, subsidence areas, high-salinity regions, fish ponds, and all-weather stadiums. From evaluation and application to site design and construction, we deliver tailored solutions. Through vertical integration, we support clients in addressing every aspect of power plant construction, from pre-construction through post-construction stages.
our service
Service Scope
feature
Service Highlights
-
1Professional Planning and ConstructionFrom evaluation and application, site design to construction, we provide tailored solutions.
-
2In-house Design and Engineering TeamsWith over 400MW of proven project development experience.
-
3Vertically Integrated ServicesWe resolve all issues related to power plant construction, from pre-construction, during construction, to post-construction.
service process
Service Process
-
1On-site Survey
The engineering design team conducts an on-site survey, planning grid integration paths, possible interconnection points, and identifying suitable locations for photovoltaic installation. Preliminary design and cost estimation are then conducted.
-
2Preliminary Assessment
We conduct a preliminary feasibility assessment based on the legality of the land location, external road rights, feeder line capacity, status of the cadastral area, land ownership structure, and rental levels.
-
3Financial Feasibility Assessment
Based on the preliminary assessment, cost estimation, and various financial parameters (e.g., feed-in tariffs, solar irradiance simulation, capacity, land costs, taxes, and interest rates), we estimate the financial feasibility of the project.
-
4Negotiation and Contract Signing
Confirm the development plan and commercial terms and conditions, then a contract is signed upon mutual agreement.
-
5Initiate Application Process
From obtaining the grid connection consent from Taipower, local government consent, power industry establishment, land change or permit approval, to obtaining construction permits and commencement approval.
-
6From Construction to Acceptance
After the project is completed and grid-connected, it enters the operational phase (including warranty and maintenance).
-
7Operations Period Services
20 years of asset management and site operations and maintenance.
applications
Success Stories
contact us
Contact Us
For any questions or suggestions, please feel free to email or call us.
Please note that we are closed on weekends, Lunar New Year, and national holidays, during which phone contact will be unavailable.
Thank you for your understanding.
Please note that we are closed on weekends, Lunar New Year, and national holidays, during which phone contact will be unavailable.
Thank you for your understanding.